beautypg.com

Storage asic initialization test, Test verify, Attributes – HP Integrity NonStop J-Series User Manual

Page 170: Logical, Actions, Abort, Delete, Start, Stop, Storage asic initialization test test verify

background image

Storage ASIC Initialization Test

Prompts the storage subsystem manager process ($ZZSTO) to initialize the storage ASIC in the
CRU. If initialization fails, an alarm is generated.

This action is triggered automatically when a new CRU is inserted while OSM is running or when
an (SCF) STATUS ADAPTER command is issued. If a CRU is inserted while OSM is not running,
perform this action after logging on to the OSM Service Connection.

Test Verify

Performs basic tests on the CRU. You can perform this action when the CRU is online.

LIF

The logical interface, associated with a physical interface (PIF), used by an Ethernet controller port
or a ServerNet adapter port.

Location in OSM Tree:

For a ServerNet adapter port LIF: System > Group > Module > adapter > SAC > PIF > LIF

Example: LIF $ZZLAN.LAN01A

Attributes

LIF

Displayed in the Attributes tab and Attributes dialog box only if the value is
something other than OK.

Values

Service State

Logical

The state of the logical interface.
Values: Started, Stopped, Unavailable

LIF State

Actions

Abort

Terminates operation of the LIF. When the Abort action finishes, the LIF is in the Stopped state.

Delete

Deletes the LIF.

Start

Starts the LIF.

Stop

Rather than automatically stopping the LIF (as the Abort action does), this action first warns you if
the LIF is currently in use (and stops it only after you confirm).

170

System Resources

This manual is related to the following products: