4 setting a project, 4 setting a project -5 – Yokogawa DAQWORX User Manual
Page 25

2-5
IM WX101-01E
1
2
3
4
5
6
7
8
9
Index
Configuring the DAQLOGGER
2.4
Setting a Project
DAQLOGGER operates on a project basis.
For each project, you can save the settings for logging and report generating functions
and those for the applications started by Software Manager.
By changing this project, you can easily switch between the sets of different settings that
have previously been saved.
Note
The operations described in the following are possible only when all DAQLOGGER applications
other than Software Manager are terminated and the password protection is not used.
Creating a New Project
To create a new project, the operation level of the current project must be “Supervisor.”
Procedure
1. Before operation, make sure that DAQLOGGER is not communicating, applications
other than Software Manager are not running, and the password protection is not
used.
2. In the menu bar of the “DAQLOGGER Manager” window, select “File” then “Project
Setting.” The “Project Setting” dialog box appears.
In the initial state, the dialog box comes out with “Project1” at the operation level of
“Supervisor.”
3. Press the “New...” button. The “New Project” dialog box appears.