Bayer HealthCare Rapidlab 800 User Manual
Page 615

Installation
HĆ23
Cleaning Reagents from the Reagent Manifold
1.
Remove all the reagent bottles from the system and perform a prime sequence.
2.
Access the Prime screen from the Menu screen:
a. Select
2 Maintenance
and press
Enter
.
b. Select
3 Prime
and press
Enter
.
3.
Select
All Reagents
and press
Enter
.
4.
Press
Done
.
5.
Press
Menu
to return to the Menu screen.
6.
Press
No
.
7.
Access Fluidics Functions from the Menu screen:
a. Select
3 Troubleshooting
and press
Enter
.
b. Select
1 Fluidics System
and press
Enter
.
c. Select
1 Fluidics Functions
and press
Enter
.
8.
Select
C1/C2
and press
Enter
.
9.
Press
Start Test
.
10. Press
Exit Test
.
11. Empty, rinse, and fill the four reagent bottles with reagent water.
12. Install the reagent bottles containing reagent water in place on the system.
13. Perform a Prime sequence as described in steps 2 through 6.
14. Perform an C1/C2 Fluidics Function Test as described sequence 7 through 10.
15. Remove the reagent bottles.
16. Air dry the pathways:
a. Repeat steps 2 through 6 without the reagent bottles in place.
b. Repeat steps 7 through 10 without the reagent bottles in place.
Cleaning the Sample Port
1.
Stop the system from the Menu screen:
a. Select
2 Maintenance
and press
Enter
.
b. Select
7 Stop System
and press
Enter
.
2.
Grasp the sample door and pull it to the right as shown in Figure H-6.
3.
Grasp the tab on the retainer ring and firmly pull the tab toward you to rotate
the ring.
2
Menu Code
3
1
Menu Code
1
3
2
Menu Code
7