Replacing the system fuses – Bayer HealthCare Rapidlab 800 User Manual
Page 277

3Ć105
Maintaining the System
b. Select
3 Measurement
and press
Enter
.
c. Select
2 COox Optics
and press
Enter
.
The COox Optics Test screen appears.
13. Press
Start Test
.
14. Check the screen for the message, Lamp test passed.
15. Press
Exit Test
.
16. Press
Exit Menu
.
17. Perform a one-point calibration from the Menu screen:
a. Select
1 Calibration
and press
Enter
.
b. Select
1 One-point
and press
Enter
.
Replacing the System Fuses
Materials required:
S 2 fuses of the appropriate rating
S small, flat-blade screwdriver
Refer to Table 3-2 to identify the correct fuses for the voltage you use.
Table 3Ć2.āăSystem Fuse Selection
Voltage
Fuse Rating
Fuse Type
100/120V
4A Slo Blo
5 x 20 mm
220/240V
2A Slo Blo
5 x 20 mm
WARNING
To prevent electrical shock or damage to the system, remove power
from your system before performing this procedure.
1.
Shut down the system from the Menu screen:
a. Select
7 System Utilities
and press
Enter
.
b. Select
3 Shutdown
and press
Enter
.
c. Press
Yes
.
CAUTION:
You must wait at least 1 minute before you disconnect the power cord,
and then wait at least 10 seconds before you reconnect the power cord. If you do
not adhere to the time intervals, you can damage the system.
2.
Wait until prompted and then disconnect the power cord from the power
source.
1
Menu Code
1
(from the Main Menu)
7
Menu Code
3
!