beautypg.com

12 testing the installation and telephone changes – Reliant Octel 200 and Octel 300 Message Servers PB6001401 User Manual

Page 176

background image

4-58

Installation and Maintenance Volume

Octel Overture 200/300 Serenade 3.0

PB60014–01

4.12 TESTING THE INSTALLATION AND TELEPHONE CHANGES

Use the following checklist to help track any installation and telephone changes, as follows:

-

Use the “See Chapter” column for reference to the appropriate chapter in the Installation and
Maintenance
volume for further information.

-

Enter the name of the person who is responsible for tracking an installation task in the “Person
Responsible” column.

-

Enter the date the installation task is to be completed in the “Scheduled” column.

-

Enter the final completion date in the “Completed” column.

Installation Task

See

Chapter

Person

Responsible

Scheduled

Completed

Receiving the Equipment

Inspect for damage

Installation

Carton

Server

ac/dc cables secure

Printed circuit cards

Reshipping procedures

Preinstallation

Environment

Installation

Dust free (Y/N)

Away from large motors (Y/N)

Server accessible (Y/N)

Power

Dedicated fuse or breaker

Dedicated 115-Vac 60-Hz
receptacle

Other required equipment available

Modular line cord

RJ11 jacks or equivalent

CAT or other ASCII terminal

Phillips screwdriver

RS-232C interface cable