Moving the equipment on-site – Reliant Octel 200 and Octel 300 Message Servers PB6001401 User Manual
Page 121

Installation 4-3
Octel Overture 200/300 Serenade 3.0
PB60014–01
Moving the Equipment On-Site
Before moving the server, verify the status of the new site:
-
Is the input power ready?
-
Is it the same as the input power required for the Octel Overture 200/300?
-
Is the installation location ready?
-
Are the telephone extensions ready to be hooked up?
Move the Octel Overture 200/300 server in the vertical, upright position on the shipping pallet. Be
careful and always remember that the Octel Overture 200/300 is delicate electronic equipment.