beautypg.com

Moving the equipment on-site – Reliant Octel 200 and Octel 300 Message Servers PB6001401 User Manual

Page 121

background image

Installation 4-3

Octel Overture 200/300 Serenade 3.0

PB60014–01

Moving the Equipment On-Site

Before moving the server, verify the status of the new site:

-

Is the input power ready?

-

Is it the same as the input power required for the Octel Overture 200/300?

-

Is the installation location ready?

-

Are the telephone extensions ready to be hooked up?

Move the Octel Overture 200/300 server in the vertical, upright position on the shipping pallet. Be
careful and always remember that the Octel Overture 200/300 is delicate electronic equipment.