<1. Overview>
1-48
IM 11B08A01-01E
● In the case where a stream sequence change command is received during the run mode in
the stream specifi cation status (for continuous measurement) [2A2]
The measurement status is changed to the requested stream sequence status when the
measurement of the currently-measured stream is completed.
In this case, the operation mode remains unchanged from the run mode.
Run
W4
W5
W6
S6
W1
S1
S5
S4
W4
W5
S4
[2A2]
Time
Stream specification 1 (Continuous)
Stream sequence 2
Assinning stream sequence 2
● In the case where a stream sequence change command is received during the run mode in
the stream specifi cation status (for N times of measurement) [3A2]
The measurement status is changed to the requested stream sequence status when the
Nth round of the measurement of the currently-measured stream is completed.
In this case, the operation mode remains unchanged from the run mode.
Stop
Run
W4
W5
W6
S6
W1
S1
W1
S1
S5
S4
W4
W5
S4
[3A2]
Time
Stream specification 1 (Twice)
Stream sequence 2
Assinning stream sequence 2
Run command
● In the case where a stream sequence change command is received during the pause mode
in the stream specifi cation status [2A6]
The measurement status is immediately changed to the requested stream sequence status.
In this case, the operation mode changes to the stop mode and valves are all closed (turned
off).
Run
[2A6]
Time
Stream specification 1
Stream sequence 2
Assinning stream sequence 2
Stop
● In the case where a stream sequence change command is received during the stop mode in
the stream specifi cation status [2A1]
The measurement status is immediately changed to the requested stream sequence status.
In this case, the operation mode remains unchanged from the stop mode.
[2A1]
Time
Stream specification 1
Stream sequence 2
Assinning stream sequence 2
Stop
2nd Edition : May 11, 2012-00