Yokogawa GC8000 Process Gas Chromatograph User Manual
Page 70

<1. Overview>
1-43
IM 11B08A01-01E
Run
W4
W1
W2
S2
S1
S4
W4
S4
[1C2]
Time
Stream sequence 1
Stream specification 4 (Twice)
Assinning stream specification 4 (Twice)
Stop
● In the case where a stream specifi cation change command is received during the pause
mode in the stream sequence status [1B6]The measurement status is immediately changed
to the requested stream specifi cation status.
In this case, the operation mode changes to the stop mode and valves are all closed (turned
off).
Run
[1B6]
Time
Stream sequence 1
Stream specification 4
Assinning stream specification 4
Stop
● In the case where a stream specifi cation change command is received during the stop
mode in the stream sequence status [1B1]
The measurement status is immediately changed to the requested stream specifi cation
status.
In this case, the operation mode remains unchanged from the stop mode.
[1B1]
Time
Stream sequence 1
Stream specification 4
Assinning stream specification 4
Stop
● In the case where a stop command is received during the run mode in the stream sequence
status [1E2]
The operation mode is immediately prepared to be changed to the stop mode.
The operation mode changes to the stop mode in the stream sequence status when the
measurement of the currently-measured stream is completed.
The stop command can be canceled with a cancel command until the operation mode
changes to the stop mode.
Run
W3
W1
W2
S2
S1
[1E2]
Time
Stream sequence 1
Stop command
Stop
2nd Edition : May 11, 2012-00
1