2 installing auxiliary hardware, 5) installation, 1) cylinders – Yokogawa GC8000 Process Gas Chromatograph User Manual
Page 121: 2) other items

<2. Installation, Piping, and Wiring>
2-4
IM 11B08A01-01E
3
6
2
17
13
4
18
12
15
14
9
7
10
8
11
1
16
5
Figure 2.2
Accessory kit
Note:
Table 2.2
Item
Parts number
Quantity
Remark
Coil over wrench for LSV
L9827EA
1
Seal kit for LSV
K9402VG
number of LSV
Seal kit for LSV
K9402VH
number of LSV
Ferrule
J9218VU
1 set
Ferrule
J9218VT
1 set
Cutter
J9218VV
1
User’s manual (CD)
—
1
IM 11B08A01-51E
Operation data
—
1
(5) Installation
Use anchor bolts to secure the self-standing type analyzer on the fl oor.
Use nuts and bolts to secure the wall-mounted type analyzer on the wall. The wall construction
has to be designed for four times the weight of the analyzer.
For the hole for installation, refer to “1.2 External Dimensions.”
2.1.2 Installing
Auxiliary
Hardware
(1) Cylinders
The following conditions must be met:
(a) Located near the analyzer or the external sampling system.
(b) Not subject to rainfall or direct sunlight
(c) Ambient temperature: 0 to 40°C
(d) The place should be well-ventilated so that leaking gases, if any, do not accumulate.
Comply with regulations for high-pressure gases.
(2) Other items
(a) Dehumidifi er
Provide a dehumidifi er between the carrier gas cylinders and the analyzer (as near the
analyzer as possible).
2nd Edition : May 11, 2012-00