Yokogawa Data Acquisition with PID Control CX2000 User Manual
Page 66
1-54
IM 04L31A01-01E
When changing the final SP of the segment
You can change the final SP during the hold operation. The ON/OFF time of the time
event and the segment time are prolonged by the amount of time the operation is held.
Hold period
(Timer stopped)
Delay for the amount of time
the timer was stopped
Final SP
Time event
ON
OFF
SEG1
SEG2
SEG3
SEG4
SEG5
Pattern after the
setpoint is changed
Target SP
changed
Pattern before the
setpoint is changed
Note
When changing the final SP with the segment time ramp rate assignment method, the
segment time is also changed. The time event's event timer is not changed.
When increasing or decreasing the remaining segment time
You can increase or decrease the remaining segment time during the hold operation.
If the remaining segment time is increased or decreased during the hold operation, the ON/
OFF time and remaining segment time is automatically adjusted by the amount of time the
operation is held and the amount of time the segment time is increased or decreased.
• Example in which the remaining segment time is increased
SEG1
SEG2
SEG5
SEG4
SEG3
Remaining segment
time increased
Final SP
ON
OFF
Time event
Hold period
(Timer stopped)
Delay for the amount of time
the timer was stopped
Pattern after the
remainig
segment time is
increased
Pattern before the
remaining
segment time is
increased
• Example in which the remaining segment time is decreased
SEG1
SEG2
SEG5
SEG4
SEG3
Final SP
ON
OFF
Time event
Hold period
(Timer stopped)
The time event also decreases by the amount
the remaining segment time was decreased.
Delay for the amount of time the timer was stopped
Pattern after the remaining
segment time is decreased
Pattern before the
remaining
segment time is
decreased
Remaining segment time
decreased
1.11 Program Control Related Settings