Yokogawa EJX115A User Manual
User’s manual
Table of contents
Document Outline
- 1. Introduction
- 2. Handling Cautions
- 2.1 Model and Specifications Check
- 2.2 Unpacking
- 2.3 Storage
- 2.4 Selecting the Installation Location
- 2.5 Pressure Connection
- 2.6 Waterproofing of Cable Conduit Connections
- 2.7 Restrictions on Use of Radio Transceivers
- 2.8 Insulation Resistance and Dielectric Strength Test
- 2.9 Installation of an Explosion-Protected Instrument
- 2.10 EMC Conformity Standards
- 2.11 Pressure Equipment Directive (PED)
- 2.12 Low Voltage Directive
- 3. Component Names
- 4. Installation
- 5. Installing Impulse Piping
- 6. Wiring
- 7. Operation
- 7.1 Preparation for Starting Operation
- 7.2 Zero Point Adjustment
- 7.3 Starting Operation
- 7.4 Shutting Down Operation
- 7.5 Transmitter Measurement Range (Determining Differential Pressure Range)
- 7.6 Venting or Draining Transmitter Pressure-detector Section
- 7.7 Setting the Range Using the Range-setting Switch
- 8. Maintenance
- 9. General Specifications
- Revision Information