Yokogawa Data Acquisition with PID Control CX2000 User Manual
Page 56
1-44
IM 04L31A01-01E
• Example in which the 2
nd
segment of the 1
st
loop is a soak segment
When set to ramp-prioritized PV1 start, the ramp-rate of the 1
st
loop is prioritized. The
program operation start point of the 1
st
loop will be point C1, D1, or E1 (depends on
the PV position a to e at that point). The program operation start point of the 2
nd
loop
(one of the other loops) is at the same time as that of the 1
st
loop. For example, if the
program operation start point of the 1
st
loop is point C1, the program operation start
point of the 2
nd
loop is point C2.
PV
SEG1
A1
B1
D1
E1
B2
C1
A2
C2
E2
D2
SEG2
SEG3 SEG4
SEG5
Time
a
b
c
d
e
Program pattern for
the 2nd loop
Program pattern for
the 1st loop
• Example in which the 3
rd
segment of the 2
nd
loop is a soak segment
When set to ramp-prioritized PV2 start, the ramp-rate of the 2
nd
loop is prioritized.
The program operation start point of the 2
nd
loop will be one of the points from A2 to
E2 (depends on the PV position a to e at that point). The program operation start
point of the 1
st
loop (one of the other loops) is at the same time as that of the 2
nd
loop.
For example, if the program operation start point of the 2
nd
loop is point A2, the
program operation start point of the 1
st
loop is point A1.
PV
SEG1
A1
B1
D1
E2
B2
C1
A2
C2
E1
D2
SEG2
SEG3
SEG4
Time
Program pattern for
the 1st loop
Program pattern for
the 2nd loop
a
b
c
d
e
1.11 Program Control Related Settings