Quantum Data 881 User Manual
Page 493

881/882 Video Test Generator User Guide
(Rev A.22)
475
DPRX:LLCT? 4 3
// Runs the link layer compliance test 4:(4.2.2.3)
“
EDID Read
” three times.
To run the Link Layer compliance test on DisplayPort sinks (receiver) through the
GUI:
1. Connect a cable between the DisplayPort Rx connector on the 882E and the device’s
DisplayPort transmitter interface with the DisplayPort function.
The following diagram depicts the test setup:
2. Setup the 882 for DisplayPort testing. Refer to “
Setting up the 882 for DisplayPort
'LVSOD\3RUW/LQN/D\HU
'LVSOD\3RUW/LQN/D\HU
6RXUFH
7UDQVPLWWHU
'87
6LQN
(
'LVSOD\3RUW5[
This manual is related to the following products: