beautypg.com

Festo Контроллер позиционирования CPX-CMAX User Manual

Page 337

background image

A. Notes on commissioning and service

A−29

Festo P.BE−CPX−CMA X−CONTROL−EN en 0908NH

Operating voltage = 0 V
Load voltage (valve) = 0 V

CMAX is OFF

SCON.MC = 0

SCON.24VL = 0

The output data should in any case be specified
at the beginning to prevent control signals from
the last operating phase from affecting the
CMAX.

Error:

CMAX not reporting back

Reset PLC output

data

Switching on the

operating voltage

Start timer:

3 seconds

The CMAX initialises the axis string and the
controller and queries the setting for the file
format in the CPX node.

Monitoring to detect a faulty module. Time may
vary, depending on the CPXC node.

[m]

[m]

[m]

[m]

[o]

[o]

Timer expired

Timer still running

SCON.FAULT = 0

SCON.FAULT = 1

SCON.MC = 1

Check commissioning

status

Cancel

Error handling

Switch on pressure

Set operating mode

Switch on valve load

voltage (= 24 V)

SCON.FAULT = 0

SCON.FAULT = 1

SCON.24VL = 1

Page

2

Cancel

Error handling

[m]

[m]

[m]

[m]

[m]

[o]

The supply pressure should be fully built up at the valve within 50 msec.
Otherwise allow for additional time after this step, or parametrise E50 as
a warning.

This action is mandatory.

This action is a recommendation. It
does not have to be carried out

[m]

[o]