beautypg.com

A.2 commissioning via the cpx node (fieldbus), A.2.1 c00: basic parametrising, Commissioning via the cpx node (fieldbus) – Festo Контроллер позиционирования CPX-CMAX User Manual

Page 318: A−10, A.2.1, C00: basic parametrising

background image

A. Notes on commissioning and service

A−10

Festo P.BE−CPX−CMA X−CONTROL−EN en 0908NH

A.2

Commissioning via the CPX node (fieldbus)

A.2.1

C00: Basic parametrising

This section contains step−by−step instructions for basic
parametrisation. Fig. A/2 shows an o verview of the proĆ
cedure. The description of the statuses C00 to C03 is required
to understand the diagram (see section A.1.2, Fig. A/1).

CMAX in delivery status

1)

Activate commissioning mode

1 = metric
2 = imperial

Set system of measurement units:

PNU 1192:05 = 1 ... 2

Define drive type:

PNU 1100:00 = 1 ... 5

Block download ON

PNU 1192:01 = 1

Load axis data

All PNUs

Block download OFF

PNU 1192:01 = 0

CMAX waiting for movement test

1)

A data reset resets the axis data to the delivery status, the device
and diagnostic data are retained.

Fig. A/2:

Basic parametrising