A.2 commissioning via the cpx node (fieldbus), A.2.1 c00: basic parametrising, Commissioning via the cpx node (fieldbus) – Festo Контроллер позиционирования CPX-CMAX User Manual
Page 318: A−10, A.2.1, C00: basic parametrising
A. Notes on commissioning and service
A−10
Festo P.BE−CPX−CMA X−CONTROL−EN en 0908NH
A.2
Commissioning via the CPX node (fieldbus)
A.2.1
C00: Basic parametrising
This section contains step−by−step instructions for basic
parametrisation. Fig. A/2 shows an o verview of the proĆ
cedure. The description of the statuses C00 to C03 is required
to understand the diagram (see section A.1.2, Fig. A/1).
CMAX in delivery status
1)
Activate commissioning mode
1 = metric
2 = imperial
Set system of measurement units:
PNU 1192:05 = 1 ... 2
Define drive type:
PNU 1100:00 = 1 ... 5
Block download ON
PNU 1192:01 = 1
Load axis data
All PNUs
Block download OFF
PNU 1192:01 = 0
CMAX waiting for movement test
1)
A data reset resets the axis data to the delivery status, the device
and diagnostic data are retained.
Fig. A/2:
Basic parametrising