Fluke Networks CertiFiber Pro Users Manual User Manual
Page 243

Chapter 9: How to Use the OptiFiber Pro OTDR Module
The Home Screen for OptiFiber Pro Modules
221
PROJECT: The project contains the settings for a job and helps
you monitor the status of a job. When you save test results, the
tester puts them in the project. Tap the PROJECT panel to edit
the project settings, select a different project, or make a new
project.
Shows a summary of the test results in the project:
: The number of tests that passed.
: The number of tests that failed.
The test setup panel shows the settings the tester will use when
you tap TEST or press .
To change these settings, tap the panel.
Note
You can set up tests for any module that the
tester can use, even when no module is attached.
Next ID: The Next ID panel shows the ID that the tester gives to
the next test results you save.
Tap Next ID to do these tasks:
Enter an ID, select a different ID in the ID set, select a
different set of IDs, or make a new set. The tester adds the
IDs and ID sets you make to the project that shows on the
home screen.
Turn Auto Save on or off.
Select End 1 or End 2 for OTDR and FiberInspector tests.
Enter a name for End 1 and End 2.
Operator: The name of the person who does the job. You can
enter a maximum of 20 operator names.
TOOLS: The TOOLS menu lets you set up the compensation
function for the launch/tail cords, use tools such as the real-time
trace and the FiberInspector test, see the status of the tester, and
set user preferences such as the language and the display
brightness.