Meridian America Link/Customer Controlled Routing User Manual
Page 17

About this guide xvii
Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide
Chapter 13: Meridian Mail configuration
This chapter shows how to
configure the Meridian 1 to support Meridian Mail.
Chapter 14: Software installation, upgrade, and update procedures
This chapter describes procedures for
¥
configuring the IPE Module and the Application Module, along with
start-up information
¥
upgrading the software from one release to another (for example, from
Meridian Link Release 4B to Release 5C)
¥
updating the software from one issue of a release to another issue of the
same release (for example, from issue 4.17 to issue 4.25)
¥
reinstalling software (for example, after replacing a hard disk)
Chapter 15: Link configuration
This chapter describes the configuration
procedures for the links used by the applications.
Chapter 16: Additional application configuration
This chapter describes
the procedures used for scheduling backups and configuring terminal and
printer ports.
Chapter 17: Hardware upgrade
This chapter describes the procedures for
upgrading from an MVME147 card to an MVME167 card and upgrading an
Option 11 IPE Module to an Options 21Ð81 IPE Module.
Chapter 18: Acceptance testing
This chapter describes the various
acceptance tests you can perform.
Chapter 19: Single Terminal Access
This chapter describes how to
configure the Meridian 1 system to support Single Terminal Access.
Chapter 20: Ordering
This chapter lists field-replaceable items for both the
IPE Module and Application Module.
Note: The term ÒMeridian 1Ó is used throughout this document, and
refers to Meridian 1 and ÒMeridian 1-readyÓ systems (such as Meridian
SL-1 style cabinets that have been upgraded).