Mounting the cabinets
Contents
This section contains information on the following topics:
"Earthquake bracing" (page 99)
Introduction
This chapter explains two methods of installing cabinets.
"Mounting the cabinet on a wall" (page 100)
describes how to mount the
cabinet on a wall.
Procedure 7 "Mounting the cabinet on the floor" (page
describes how to mount the cabinet on the floor using a pedestal.
Note: For a CS 1000M Cabinet system, the Signaling Server must
be mounted in an external 480 mm (19 in.) equipment rack. Refer to
Signaling Server Installation and Commissioning (NN43001-312) for
information on installing the Signaling Server hardware.
Earthquake bracing
If the Small System cabinets require earthquake bracing, refer to the
earthquake bracing requirements in the chapters on system and site
requirements in Communication Server 1000M and Meridian 1 Small
System Planning and Engineering (NN43011-220) before continuing.
Nortel Communication Server 1000
Communication Server 1000M and Meridian 1 Small System Installation and Commissioning
NN43011-310
01.04
Standard
Release 5.0
13 May 2008
Copyright © 2008, Nortel Networks
.