Connecting other battery backup systems, Figure 70 power cord routing, Procedure 19 installing other battery systems – Nortel Networks 1000M User Manual
Page 155

Connecting other battery backup systems
155
Figure 70
Power cord routing
Connecting other battery backup systems
This procedure describes how to install and connect customer-supplied
battery backup systems.
Charging capabilities of the Cabinet system are described in Communication
Server 1000M and Meridian 1 Small System Planning and Engineering
(NN43011-220). The system external ground must be installed before
installing the battery backup.
Procedure 18
Installing other battery systems
Step
Action
1
Unpack the battery box and place it according to the equipment
layout plan.
2
Remove its cover.
3
Set the switch on the battery box to OFF.
Nortel Communication Server 1000
Communication Server 1000M and Meridian 1 Small System Installation and Commissioning
NN43011-310
01.04
Standard
Release 5.0
13 May 2008