Connecting other battery backup systems

155

Figure 70
Power cord routing

Connecting other battery backup systems

This procedure describes how to install and connect customer-supplied
battery backup systems.

Charging capabilities of the Cabinet system are described in Communication
Server 1000M and Meridian 1 Small System Planning and Engineering
(NN43011-220)
. The system external ground must be installed before
installing the battery backup.

Procedure 18

Installing other battery systems

Step

Action

1

Unpack the battery box and place it according to the equipment
layout plan.

2

Remove its cover.

3

Set the switch on the battery box to OFF.

Nortel Communication Server 1000

Communication Server 1000M and Meridian 1 Small System Installation and Commissioning

NN43011-310

01.04

Standard

Release 5.0