Ntak76 battery unit installation, Figure 67 cable connections, Procedure 18 installing the ntak76 battery unit – Nortel Networks 1000M User Manual
Page 151
![background image](/manuals/191775/151/background.png)
NTAK76 battery unit installation
151
Figure 67
Cable connections
NTAK76 battery unit installation
Follow
Procedure 17 "Installing the NTAK76 battery unit" (page 151)
to
install an NTAK76 battery unit. Repeat the procedure for each system
cabinet being installed.
Note: The system external ground must be installed before installing
the battery backup unit.
Procedure 17
Installing the NTAK76 battery unit
Step
Action
1
Unpack the NTAK76 battery unit and place it according to the
equipment layout plan.
•
The battery unit must be installed within 0.9 m (3 ft) of the
cabinet it is serving.
•
The battery unit must be installed beside or below the cabinet,
not above.
•
If installed below, the minimum clearance from the top of the
NTAK76 to the bottom of the wall-mounted cabinet is 0.6 m (2 ft).
•
The battery unit should be installed in an open, well-ventilated
area.
Nortel Communication Server 1000
Communication Server 1000M and Meridian 1 Small System Installation and Commissioning
NN43011-310
01.04
Standard
Release 5.0
13 May 2008
Copyright © 2008, Nortel Networks
.