Nortel Networks 1000M User Manual
Page 71
![background image](/manuals/191775/71/background.png)
71
Preparing for installation
Contents
This section contains information on the following topics:
"Readiness checklist" (page 72)
Introduction
WARNING
Before a Small System can be installed, a network assessment
must be performed and the network must be VoIP-ready.
If the minimum VoIP network requirements are not met, the system
will not operate properly.
For information on the minimum VoIP network requirements and
converging a data network with VoIP, refer to Converging the Data
Network with VoIP Fundamentals (NN43001-260).
Before proceeding with the installation, make sure you have all the tools
necessary to install the Small System. Next, make sure you have checked
for all site requirements, received all equipment, and have prepared an
equipment layout plan and card slot assignment plan.
Tools checklist
To install the system correctly, make sure that the following tools are
available before you begin to assemble the components:
Nortel Communication Server 1000
Communication Server 1000M and Meridian 1 Small System Installation and Commissioning
NN43011-310
01.04
Standard
Release 5.0
13 May 2008
Copyright © 2008, Nortel Networks
.