beautypg.com

Rockwell Automation 8520-ARM2 9/Series CNC AMP Reference Manual Documentation Set User Manual

Page 28

background image

Using AMP Applications and ODS Utilities

Chapter 2

2-2

Figure 2.1 shows the process of creating an AMP file.

Figure 2.1

Process of Creating AMP for a Control

Backup to the

control’s memory

START ODS

Verify or assign

value for each

parameter in

that group

AMP

Edit

Select next

parameter

group, process or

axis

Correct AMP

parameters as

required

AMP

Edit

Save AMP file

Download to

control for

testing

AMP

OK ?

yes

no

Download

AMP

yes

no

Open existing

file or create

new AMP file

Configure axes

and servos

using F--2 axis

option

Configure process

using F5--Process

option (for Dual

Controls only)

Select first

parameter

group

Select axis

to configure

using F--2

option

Select process to

configure using F--5

Process option (for

Dual Controls only)

Done

with all axes,

processes and

groups?

Important: Throughout this chapter the term select means to do either of

the following:

type in the letter indicated on the pull-down menu that corresponds
to the desired selection

use the cursor keys to highlight the selected item on the pull-down
menu, then press

[ENTER]