beautypg.com

HEIDENHAIN TNC 407 (280 580) User Manual User Manual

Page 266

background image

8-59

8

Cycles

TNC 407/TNC 415 B/TNC 425

8.6

Other Cycles

Start of activation

Cycle 19 becomes effective as soon as it is defined in the part program.
If the function TILTING PROGRAM RUN is activated in MANUAL mode
(see page 2-11), the angle value entered in this menu will be overwritten
by cycle 19.

Input data

ROTARY AXIS AND ANGLE:
Rotated axis with tilt angle.
Axes A, B and C are programmed with soft keys.

Entry of an angular axis and the associated angle in cycle 19 does not result in movement of the axis. You must
move the axis to the corresponding angle, for example with an L block.

Cancellation

Define the cycle again, entering NO ENT for all data.

Position angular axis

To machine in a tilted plane, the corresponding angular axis is positioned
to the required angle conventionally—normally with an L block.

NC blocks

L Z+100 R0 FMAX
L X+25 Y+10 R0 FMAX
L A+15 R0 F1000

Position the angular axis

CYCL DEF 19.0 WORKING PLANE
CYCL DEF 19.1 A+15

Define angle for calculation
of compensation

L Z+80 R0 FMAX

Activate compensation, Z axis

L X–7.5 Y–10 R0 FMAX

Activate compensation, X/Y axis

Position display in a tilted system

Upon activation of cycle 19 the displayed positions (ACTL. and NOML.)
and the datum are referenced to the tilted coordinate system. The posi-
tions displayed immediately after cycle definition may not be the same as
the coordinates of the last programmed position before cycle 19.

As soon as you move an axis in a tilted system, the compensation for this
specific axis is activated. You must move all axes to activate compensa-
tion for all axes.

Work space monitoring

In the tilted coordinate system, the TNC checks for limit switches only in
the axes which are moved. An error message will be output if necessary.