2 creating/editing/deleting measuring systems, Creating/editing/deleting measuring systems, Defining the system functionality – Lenze Engineer v2.21 User Manual
Page 199
![background image](/manuals/566294/199/background.png)
Lenze · Engineer · 2.13 EN - 10/2014
199
Defining the system functionality
Creating an interconnection via the electrical shaft
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
8.14.5.2
Creating/editing/deleting measuring systems
If you open the Project view and select an already existing electrical shaft
, the Workspace
contains the Measuring systems tab in which all the existing measuring systems are shown:
• In the list field all measuring systems that have already been created are shown.
• By clicking the New button, you can, if necessary, create additional measuring systems that
cannot be directly assigned to a drive (e.g. for additional correction-value encoders in the
machine).
• You can delete a measuring system that is no longer needed by selecting a measuring system in
the list field and clicking the Delete button.
• By selecting a measuring system in the list field and clicking the Edit button (or simply by
double-clicking the measuring system in the list field), you open the Measuring system dialog
box in which the data of the corresponding measuring system are shown and can also be edited: