Rockwell Automation 1757-SWKIT4000 ProcessLogix R400.0 Installation and Upgrade Guide User Manual
Page 34

Publication 1757-IN040B-EN-P - March 2002
2-8 Operating System Installation Procedures
•
Only the Accessories and Utilities, Indexing Service and
Script Debugger remain checked.
•
Click Next
.
14. At the Date and Time Settings window:
•
If necessary, adjust the Date and Time settings.
•
Set the appropriate Time Zone for your location.
•
Uncheck the Automatically adjust clock for daylight saving
changes option.
•
Click Next.
15. If setup has not found a suitable Network Device, you will be
prompted for installing one. Follow the instructions for adding a
manufacturer supplied driver or add the Microsoft Loop Back
adapter.
16. Choose the Custom settings option and click Next.
17. At the Networking Components window, select Internet Protocol
(TCP/IP) and click Properties.
18. Choose the IP Address option.
•
Fill in the appropriate IP address.
In some organizations it is important for these addresses to be
controlled by the IT organization. Consult your company’s
practices and IT organization for the appropriate IP address
information. It will be necessary to use valid IP information to
integrate the ProcessLogix Control system with the Business
Network.
ATTENTION
!
Failure to uncheck the Automatic adjustment for
Daylight Savings Time will cause Redundant
Systems to loose “Sync” when the time is
automatically adjusted. Choosing not to
automatically adjust the time allows you to decide
when to make the adjustment (at a time that is not
critical to your process).
ATTENTION
!
IP Addresses are critical to the communication of
the system. Rockwell Automation suggests, when
possible, to utilize a Private Network for the control
system. (Not connected to any other networks.)
This isolates the control system from interference
from any business communication.