8-30 Supplementary Procedures
14. Select the contents (CMs, SCMs, IOMs) of the CEE folder and
click Edit
⇒
Delete.
15. Click Delete Selected object(s) to delete the selected objects.
16. Click the CPM icon, and click Edit
⇒
Delete.
17. Click Delete Selected object(s) to delete the non-redundant
CPM.
18. In Project tab, click the CEE folder icon.
19. Click Tools
⇒
Assign to call up the Controller Assignments dialog
box.
Confirm that the check boxes for the selection Show CMs and
Show IOMs are checked.
20. Select the CEE associated with the non-redundant CPM in the
Select a CEE list box.
21. Select all the modules listed in the Assigned Modules list box.
Document the modules you will be unassigning.
22. Click Unassign.
Wait for modules to be unassigned and removed from the
Assigned Modules list box.
23. Click Close and return to the Project tab.
24. Click the CPM icon and click Edit
⇒
Delete.
25. Click the Delete Selected object(s) button to delete the CPM and
its associated CEE.
26. Close Control Builder.
Installing and connecting Redundant Chassis Pair (RCP)
Hardware
Refer to the following data in Knowledge Builder for general
information about Controller redundancy and how to install and
connect the 1757-PLX52, 1757-SRM Redundancy Module (SRM), and