Metrohm tiamo 1.1 Manual User Manual
Page 719

Subwindow Devices
691
Note
Thes parameters are only editable for devices with status
not ok
(power and/or
RS connection interrupted).
GLP
GLP test date
Date selection
Date of the last GLP test. This date can be selected after pressing
in the
dialog window
Select date
(see General program functions - Edit - Select
date).
Comment on GLP test
1000 characters, [ empty ]
Comments about GLP test.
Monitoring of GLP validity
on, [ off ]
If this option is switched on then the time interval for the GLP test will be
monitored.
Note
This option can only be switched on when a date has been entered under
GLP
test date
.
GLP test interval
0 ... [ 999 ] days
Time interval to next GLP test. If an interval is entered here then the date for
the
Next GLP test
will be adapted automatically.
Next GLP test
Date selection, [GLP test date + 999 days ]
Date on which the next GLP test is to be carried out. This date can be se-
lected after pressing
in the dialog window
Select date
(see General
program functions - Edit - Select date). After the date has been entered the
value for the
GLP test interval
will be adapted automatically.
Action
If the time interval for the GLP test has expired then one of the following actions
will be triggered at both the Start test and the command sequence: