Metrohm tiamo 1.1 Manual User Manual
Page 712

684
Configuration
Number of positions
Shows the number of positions on the rack. If no rack is in position then the
display will be empty.
Shift rate
3 ... [ 20 ] °/s
Sample rack speed of rotation for manual operation.
Opens the dialog window
Rack data
(see Configuration - Subwindow Rack
data - Rack properties) or
Rackdata (774)
in which the data of the attached
rack is shown and can be edited.
Initializes the attached rack. This resets the rack, lift and swing head, reads
off the rack code and transfers the corresponding rack data to the Sample
Processor.
MSB #
Request for dosing device preparation
Selection when the request for carrying out the command
PREP
(prepare) is to be
shown for the dosing device connected to the MSB.
At program start
[ on ], off
If this option is switched on then at each program start the request to pre-
pare the dosing device will appear.
On attaching an exchange/dosing unit
[ on ], off
If this option is switched on then each time that an exchange unit is at-
tached to the Dosimat or each time that a dosing unit is attached to the
Dosino the request to prepare the dosing device will appear.
Time interval
on, [ off ]
If this option is switched on then the request to prepare the dosing device
will appear after the time interval defined here.
all
0.1 ... [ 12.0 ] ... 999.9 h
Time interval after which the request to prepare the dosing device will ap-
pear.