3 command name – Metrohm tiamo 1.1 Manual User Manual
Page 295

Subwindow Results
267
s(rel):
Shows the relative standard deviation for statistically evaluated results.
n:
Shows the number of measurements for statistically evaluated results.
4.10.3 Command
name
Show the results for a single calculation command. The command name is shown
as the title of the tab. The sequence of the shown results corresponds to that de-
fined in the calculation command.
Result 'Result name'
Name of the result in the
CALC
command for which the information is to be
shown.
Note
Only the last results to have been calculated will be shown. For example, if there
are several commands that produce a result with the same name, then the cor-
responding result data will only be shown for that command that was the last to
calculate the result. Nothing will be shown for the other commands.
'Result':
Shows the result name and result value with the defined number of decimal
places and units.
Note
If a result value is monitored and if it lies within the limits defined in the
CALC
command then the text will be shown in
green; if it is outside the limits it will be
shown in
red.
Mean value:
Shows the mean value for statistically evaluated results.
s(abs):
Shows the absolute standard deviation for statistically evaluated results.
s(rel):
Shows the relative standard deviation for statistically evaluated results.
n:
Shows the number of measurements for statistically evaluated results.
Assignment:
Assigns the result to one of the result columns
RS01...RS25
in the Determi-
nation overview.
Formula:
Shows the formula used for calculating the result.