Metrohm tiamo 1.1 Manual User Manual
Page 148

120
Workplace
the set counter then the current statistical data will first be deleted and
the statistics counter reset to
0
.
6 - Main run
When processing the loaded method the following actions can be carried out:
• Process main track
After the start of the Main track the status changes to
BUSY
. The com-
mands of the main track and the other tracks that it calls up are proc-
essed in sequence. If the main track calls up tracks that are not free
then a pause will be made until these tracks can be started.
• Interrupt and continue run
A running determination can be interrupted at any time with
[Hold]
and
then continued with
[Cont]
. All the active tracks will be stopped and
continued together.
• Cancel sequence
A running series can be canceled at any time with
[Stop]
. An Exit track
may be carried out; the determination will be terminated.
• Cancel by error
If when a determination is being carried out an error occurs that
causes the cancellation of the determination then an Error track may
be carried out; the determination will be terminated.
• Process exit track
When the main track and all the other tracks that it has called up have
been completed then an Exit track may be carried out; the determina-
tion will be terminated. After the end of the Main track the status
changes to
READY
.
7 - Post-conditioning (only for methods with conditioning)
In methods that contain commands with switched-on conditioning and in which
the option
Automatic conditioning
is switched on in the
START
command then for all
these commands post-conditioning will be started automatically with the loaded
method immediately after the end of the track that contains the conditioning
command.
• Conditioning requirement not fulfilled
After the start of post-conditioning the status changes to
COND BUSY
.
In this status a new determination can be started with
[Start]
, even
though the conditioning requirement has not been fulfilled. Condition-
ing can also be canceled with
[Stop]
or interrupted with
[Hold]
and
then continued with
[Cont]
. If an error occurs during conditioning then
neither the Error track nor the Exit track will be carried out.
• Conditioning requirement fulfilled
If the conditioning requirement has been fulfilled then the status
changes to
COND READY
. In this status a new determination can be
started with
[Start]
. Conditioning can also be canceled with
[Stop]
or
interrupted with
[Hold]
and then continued with
[Cont]
. The condition-
ing requirement will continue to be monitored continuously until the
determination has been started.