Screen reference – Interlogix VEREX Director User Manual
Page 57

21-0381E v4.9.1
Welcome
Report
Control Admin Sys
Config Tech-Ref
49
Screen Reference
- Guard Tour (bottom of form): This is
where you select a guard tour to view
or edit (or "New Tour" to add a new
one). This area shows a reference
number assigned by the system, and
the name of the guard tour, once
defined;
- Name: A suitable name / description
for the guard-tour.
Tip: Be sure to change this from the
default setting of "New Tour".
- Action: The actions to occur if the
guard is late or absent at one of the
checkpoints (whether to abort the tour,
trigger an alarm, and/or sound the
siren output on the specific panel);
- (Station / Checkpoint List): The main portion
of this screen shows the stations (checkpoints)
for the selected guard-tour, in the order they
occur. The minimum and maximum times are
also shown (both since the previous checkpoint,
and the total).
Area Arm/Disarm Commands: These trigger
automatically when the guard accesses the preceding
station within the allowed time.
- [Select Station]: Click this to allow adding
doors and guard-tour input-points to this guard-
tour, and setting the allowable time-range for the
guard to arrive from the previous station /
checkpoint (in minutes);
This is the same as right-clicking the centre portion of
the form and selecting "Add New".
Multi-Panel Systems: Items to be added to a guard-
tour can be set to display either as a single list, or on a
panel-by-panel basis. For details on these choices,
refer to "Other Desktop Choices".
- [Remove]: Click this to remove a selected
checkpoint (door or input-point) from the guard-
tour;
- [Edit]: Click this to allow changing an existing
checkpoint:
+ Selecting a different door or guard-tour input-point,
and/or;
+ Changing the allowable time-range for the guard to
access this checkpoint;
- [Up]: Moves a selected checkpoint up to an
earlier position in the guard-tour, while leaving
the time-range values as-is;
- [Down]: Moves a selected checkpoint down to a
later position in the guard-tour, while leaving the
time-range values as-is.
After changing the position of any stations (checkpoints)
in a guard-tour, be sure to always re-check the min/max
time values. (To change the times, select the item in
the guard-tour, click [Edit], and make your desired
changes, clicking [Ok] when finished.)
Guard Tours