beautypg.com

Avago Technologies MegaRAID Fast Path Software User Manual

Page 395

background image

LSI Corporation Confidential

|

July 2011

Page 395

MegaRAID SAS Software User Guide

Chapter 9: Monitoring Controllers and Its Attached Devices

|

Monitoring Rebuilds and Other Processes

The Group Show Progress window displays a percent-complete indicator for drive
rebuilds. Rebuilds may take a long time to complete and cannot be aborted. An
up-arrow appears above the drive icon while it is being rebuilt.

Operations on virtual drives appear in the left panel of the window, and operations on
drives appear in the right panel. The type of operations that appear in this window are
as follows:

Initialization of a virtual drive (see

Initializing a Virtual Drive

)

Rebuild (see

Rebuilding a Drive

)

Consistency check (see

Running a Consistency Check

)

Non FDE Physical Drive Erase

Virtual Drive Erase

A Modify Drive Group process cannot be aborted. To abort any other ongoing process,
click the Abort button next to the status indicator. Click Abort All to abort all ongoing
processes. Click Close to close the window.