beautypg.com

Metrohm tiamo 1.0 Manual User Manual

Page 147

background image

Subwindow Run

123

6 - Main run

When processing the loaded method the following actions can be carried out:

Process series start track

At the start of the first determination in a series the Series start track is
started. If during the run of this track

[Stop]

is pressed then the Exit

track will start; if an error occurs the Error track starts.

Process main track

After the start of the Main track the status changes to

BUSY

. The com-

mands of the main track and the other tracks that it calls up are proc-
essed in sequence. If the main track calls up tracks that are not free
then a pause will be made until these tracks can be started.

Interrupt and continue run

A running determination can be interrupted at any time with

[Hold]

and

then continued with

[Cont]

. All the active tracks will be stopped and

continued together.

Interrupt and continue series

A running series can be interrupted at any time with

[Pause]

. The de-

termination that is running in the series will be completed, but no new

determination will be started. With

[Cont]

the next determination in the

interrupted sample series will be started.

Cancel sequence

A running determination can be canceled at any time with

[Stop]

. An

Exit track may be carried out; the determination will be terminated.

Cancel by error

If when a determination is being carried out an error occurs that
causes the cancellation of the determination then an Error track may
be carried out; the determination will be terminated.

Process exit track

When the main track and all the other tracks that is has called up have

been completed then an Exit track may be carried out; the determina-
tion will be terminated.

Process series end track

At the end of the last determination in a series the Series end track will
start. If when this track is being processed

[Stop]

is pressed then the

determination will be terminated, if an error occurs then the Error track
starts.

7 - Post-conditioning (only for methods with conditioning)

In methods that contain commands with switched-on conditioning and in which
the option

Automatic conditioning

is switched on in the

START

command then for all

these commands post-conditioning will be started automatically with the loaded
method immediately after the end of the track that contains the conditioning
command. After the start of post-conditioning the status changes to

COND BUSY

.

In this status the conditioning can be stopped with

[Stop]

or interrupted with

[Hold]

and continued with

[Cont]

. If an error occurs during conditioning then neither the

Error track nor the Exit track will be carried out.

Conditioning between two determinations

Conditioning will continue to run until the new method is loaded for the
next determination.

Conditioning at the end of the last determination

After the Series end track has been carried out conditioning will con-

tinue to take place until it is terminated with

[Stop]

.