beautypg.com

1 front load – INFICON IC6 Thin Film Deposition Controller User Manual

Page 296

background image

15 - 26

PN

07

4-

50

5-

P1

F

IC6 Operating Manual

15.8.1 Front Load

Follow the procedure below to replace the crystal in the Front Load sensor: (see

Figure 15-1

)

1

Gripping the crystal holder with your fingers, pull it straight out of the sensor
body.

2

Gently pry the crystal retainer from the holder (or use the Crystal Snatcher; see

Figure 15-6 on page 15-30

).

3

Turn the retainer over and the crystal will drop out.

4

Install a new crystal, with the patterned electrode face up.

5

Push the retainer back into the holder and replace the holder in the sensor
body.

Figure 15-1 Front load crystal sensor (exploded)

Front Load Crystal Holder

(IPN 750-172-G1)

Front Load Standard

Crystal Sensor Body

(IPN 750-207-G1)

Crystal (IPN 008-010-G10)

Fully Coated Face (Gold)

Finger Spring Contact

(IPN 750-171-P1)

Crystal Retainer

(IPN 007-023)

In-Vacuum Cable

To XIU

Water Tubes