beautypg.com

6 creating a subsequence (subseq), 1 loading / saving a subsequence – Metrohm 900 Touch Control Manual User Manual

Page 489

background image

■■■■■■■■■■■■■■■■■■■■■■

29 Parameters

900 Touch Control

■■■■■■■■

473

NOTE

The sample variable can only be set on rack positions which are not
defined as special beakers.

Input range

1 - 999

Default value

1

29.17.6 Creating a subsequence (SUBSEQ)

It is useful, particularly with more complex tasks, e.g. rinsing sequences or
Liquid Handling, to combine individual command sequences into a single
subsequence. Subsequences are managed the same as method com-
mands. A maximum of 99 commands can be combined to form a single
subsequence. There is no limit to the number of subsequences within one
method.

[Load/ Save]

Loading a saved subsequence or saving the current subsequence.

[Subseq. options]

Defining various settings which correspond to the entire subsequence.

[Insert command]

Insert a new method command. It is inserted before the selected com-
mand.

NOTE

Not all commands are available for subsequences. Commands which
cannot be inserted into subsequences are disabled.

[Delete command]

Delete the selected method command.

[Edit command]

Edit the selected method command.

29.17.6.1

Loading / saving a subsequence

[Load/ Save] is used to load stored subsequences or to save new subse-
quences. This means that they are available for all methods and only have
to be created once.