4 activate application, Activate application – Lenze E94ARNE Regenerative power supply User Manual
Page 42
9400 regenerative power supply module | Parameter setting
Device interface
Device commands
42
L
EDS94ARNExxxx EN 2.3 - 06/2014
4.1.4
Activate application
If several applications are available on the memory module, the
= "5: Activate
application" device command can be used to activate the application with the number set
[4-3]
"Activate application" function
Only possible when the controller is inhibited and the application has been stopped.
The auto-start setting selected in
determines whether the application is
started at the same time.
After mains switching, the default application is reloaded into the regenerative power
supply module.
If after mains switching another application than the one preset by Lenze is to be
loaded, this application must be activated first and then the selected application must
be saved with the device command "
The number of the currently active application is displayed in
Possible status displays for this device command
Related device commands
* In this example the application selection "2" is set in
PS
9400
RAM
Firmware
Application
PS
Application 3
Memory module MM
Application 1
Application 2*
PS
Note!
When the application is activated, the corresponding start parameter set is
loaded automatically and parameter settings executed before will get lost
unless the parameter set has been saved before!
Status (
Meaning
361730 Device command in process
327680 Device command executed successfully
327681 General fault