Task 3: configure the target database, Task 4: initialize the logical target, Rget system, proceed to – HP Integrity NonStop H-Series User Manual
Page 92: Abase. see

Configuring DSM/SCM
DSM/SCM User’s Guide — 529846-014
5 - 7
Task 3: Configure the Target Database
Task 3: Configure the Target Database
Both host systems and target systems contain a target database. Use ZPHITMI to
check the defaults for the DSM/SCM target database information and update it as
necessary:
1. Configure the target system profile. For more information, see
2. Designate scratch volumes for this target system. For more information, see
Updating Target Volume Usage (ZPHITMI and ZPHIHMI)
3. Set security for operators and database administrators of this target system. See
Setting Security for Target Database Administrators (ZPHITMI)
Setting Security for Operators
Task 4: Initialize the Logical Target
This manual is related to the following products: