Checking requests, Displaying the request window, Figure 16-1 – HP Integrity NonStop H-Series User Manual

Page 286: Request scheduling options dialog box, View other options, see, Ing options dialog box. see

background image

Managing Requests

DSM/SCM User’s Guide — 529846-014

16 - 3

Checking Requests

2. Schedule the request. To run the request immediately, by default no action is

necessary. To schedule a later time for the request to run, click Later and enter a
time and date using the format shown in the date and time fields.

3. Click OK. The request is submitted to run at the scheduled time.

Checking Requests

In the Planner Interface, you can display a list of all requests for which a record
currently exists in the database. These requests can be running, stopped prematurely,
or finished. The last request submitted is first in the list.

Displaying the Request Window

The Requests window lists the request name, status, and ID of the planner who
submitted the request for each request known to DSM/SCM. To display the Requests
window:

1. From the Planner Interface, select a software input or configuration revision.

2. Select Requests>Requests list.

Note. The default time is immediately for all requests except the Apply request on
systems connected to the host by Expand, where the default is to run immediately after the
Build request finishes.

Figure 16-1. Request Scheduling Options Dialog Box

VST107.vsd