Project' 'global replace, Project' 'check, L-force | plc designer – Lenze PLC Designer PLC Designer (R2-x) User Manual
Page 170

L-force | PLC Designer
The Individual Components
168
DMS 3.2 EN 02/2011 TD29
Message window with search result display
If you double-click the mouse on a line in the message window or press
editor opens with the object loaded. The line concerned in the object is marked. You
can jump rapidly between display lines using the function keys
6.3.38
'Project' 'Global replace'
With this command you can search for the location of a text in POUs, data types, or
the objects of the global variables and replace this text by another. This is executed in
the same way as with 'Project' 'Global Search' or 'Edit' 'Replace'. The libraries, however,
are not offered for selection and no display in the message window is possible.
Results are displayed in the message window.
6.3.39
'Project' 'Check'
This command provides commands for checking the semantic correctness of the
project. The status of the most recent compilation will be regarded. If you have
changed the project in the mean time, do a recompilation in order to get an up to date
check result. Otherwise you will get an appropriate warning in the message window.
A submenu listing the following commands will open:
• Unused Variables
• Overlapping memory areas
• Concurrent Access
• Multiple Write Access on Output
The results will be displayed in the message window.
Note!
In the project options, category 'Build', you can define these semantic checks to be
done at each compilation of the project automatically.