Melsec-q, 10 high-level positioning control, Start time chart – MITSUBISHI ELECTRIC Mitsubishi Programmable Logic Controller QD75D User Manual
Page 439
![background image](/manuals/118065/439/background.png)
10 - 25
MELSEC-Q
10 HIGH-LEVEL POSITIONING CONTROL
Start time chart
The following chart shows a time chart in which the positioning data No. 1, 2, 10,
11, and 12 of axis 1 are continuously executed as an example.
(1) Block start data setting example
Axis 1 block
start data
Da.11
Shape
Da.12
Start data No.
Da.13
Special start
instruction
Da.14
Parameter
1st point
1: Continue
1
0: Block start
–
2nd point
0: End
10
0: Block start
–
•
•
(2) Positioning data setting example
Axis 1 position-
ing data No.
Da.1
Operation pattern
1
11: Continuous path control
2
00: Positioning complete
•
10
11: Continuous path control
11
11: Continuous path control
12
00: Positioning complete
•
(3) Start time chart
[Y10]
PLC READY signal
QD75 READY signal
[X10]
[XC]
Positioning complete signal
V
t
Error detection signal
Positioning data No.
Dwell time
12(00)
Operation pattern
1(11)
1st point [buffer memory address 26000]
2nd point [buffer memory address 26001]
11(11)
10(11)
2(00)
7000
1
-32767
10
(8001
H
)
(000A
H
)
Cd.3 Positioning start No.
Cd.4 Positioning start point No.
Positioning start signal
[X0]
Start complete signal
BUSY signal
[X8]
[X14]
[Y0]
Dwell time
Fig. 10.3 Start time chart for high-level positioning control (block start)