Enterasys Networks X-Pedition XSR CLI User Manual
Page 536
ATM Clear and Show Commands
13-110 Configuring ADSL
Parameters in the Sub-Interface Response
The last section contains the MIB2 interface table as described in RFC‐1213.
General info:
MIB2 interface table entries as described in RFC‐1213 including
AIS F4, RDI F4, CC F4, LPBK F4.
The last four fields in the General info section count the number
OAM cells (by type) received by the interface on the Virtual Path
(F4) flow.
The circuit table at the end of the display lists all the configured
ATM sub‐interfaces related to this ATM interface.
•
VPI/VCI ‐ PVC circuit identifier.
•
AAL5 ‐ Sum of AAL5 frames received.
•
AIS ‐ Sum of received Alarm Indication Signal cells received.
•
RDI ‐ Sum of Remote Defect Indication cells received.
•
CC ‐ Sum of Continuity Check cells received.
•
LPBK ‐ Sum of Loopback cells received.
•
AIS/RDI ‐ the current alarm state of the circuit: AIS or RDI
ATM 1/0.1 is Admin Up / Oper Up
Administrative state: Admin Up or Admin Down; Operational
state: Oper Up or Oper Down.
Internet address is 30.0.0.11,
subnet mask is 255.255.255.255
IP layer information.
LCP State: OPENED/IPCP
State: OPENED
PPP layer information.
PPP Layer Information
PPPoE is Oper Up
The logical link is currently Up
The Name of the Access Concentrator
is ENTERASY-CDDU1S
The Session Id is 0x000b
The MAC Address of the Access
Concentrator is
0x00:60:f9:11:01:08
The MTU is 1492
The name of this device is adsl-0
Hardware device name.
Administrative state is ENABLED
Driver administrative state: ENABLED or DISABLED.
Operational State is UP
Driver operational state: UP or DOWN
Circuit monitoring enabled/Circuit
monitoring disabled
Circuit monitoring operational state. This line will only be
displayed when OAM procedures are enabled by the
OAM-PVC
command and the ADSL line is UP .
VPI is 1/VCI is 32
Virtual Path Index and Virtual Circuit Index for the ATM PVC.