beautypg.com

9000-specific task download procedure, Creating a unit configuration file – Verilink 9000 Series (34-00271) Product Manual User Manual

Page 102

background image

80

C

HAPTER

4: NMCS

8

Set each 9000 card back to Run mode and the thumbwheels to 1, 2, 3, or 4.

9

Remove and apply power to the chassis.

10

Set the thumbwheels to 1.

9000-Specific Task

Download

Procedure

This procedure applies only in cases where the MultiPro unit is not configured using
NMCS.

In the 6400 and 6800 chassis, each 9000 card is a line module, the top one being
number 1 and the bottom one being 3 for the 6400 and 8 for the 6800. One line
module is downloaded at a time.

1

Remove power from the 6400 or the 6800 chassis.

2

Set the thumbwheels to position 0 and set the Run/Config switches to Config for
all the 9000 cards in the chassis.

3

Connect the MultiPro unit’s Supervisory port of line module 1 to the serial port of
the PC.

4

Apply power to the chassis.

5

Type ICP on the PC with ICP.EXE installed.

Creating A Unit Configuration File

1

Create a download configuration number on the Main Menu screen. Beginning at
the Create Configuration field, assign a unique number.

2

Press F10 to access the Global Parameters screen. Program the listed parameters as
follows.

Configuration Title:

[Task_Download suggested (no spaces allowed)]

Download Station Address:00

Com Port Speed:

38400

TXPORT Model:

PDC9200

No. of Ports on Unit:

06

Firmware Version:

6.00 (revision of core firmware)

Network Unit No.:

000

Power Supply Serial No.: (optional, reference only)

Chassis Serial No.:

(optional, reference only)

Console Password:

(if necessary)

COM Port:

(mandatory; PC COM port)