Metrohm tiamo 2.2 (ProcessLab) User Manual
Page 1456
7.12 855 Robotic Titrosampler
■■■■■■■■■■■■■■■■■■■■■■
1440
■■■■■■■■
tiamo 2.2 (ProcessLab)
GLP test interval
Time interval to next GLP test. If a value is entered here then the date in the
field Next GLP test will be adapted automatically.
Only editable when the monitoring is activated.
Range
1 ... 999 Days
Default value
999 Days
Next GLP test
Date on which the next GLP test is to be carried out. The date can be selected
by clicking on the symbol
in the dialog window Select date (see Chapter
2.5.1, page 83). After the date has been entered, the field GLP test inter-
val will be adapted automatically.
Only editable when the monitoring is activated.
Default value
GLP test date + 999 days
Message
The message options can only be edited if monitoring is switched on.
Message by E-mail
on | off (Default value: off)
The message is additionally sent to the e-mail address defined under [E-
mail] if this option is activated. The message is sent in text format.
[E-mail]
[E-Mail] opens the Send e-mail window (see Chapter 2.6.1, page 86).
Acoustic signal
on | off (Default value: off)
If this option is enabled, an acoustic signal will be emitted additionally to the
message defined above
Action
The actions can only be edited if monitoring is switched on.
If during monitoring it is found that the validity period has expired then one
of the following actions will be triggered automatically at Start test.
Selection
Record message | Display message | Stop deter-
mination
Default value
Display message
Record message
The message that the validity period has expired will be automatically
saved with the determination.