Finally, you will be prompted for staking out a second Slope Stake, a more rarely used option whose purpose is to

establish “line” (the direction) from the first offset stake to the slope stake itself. This permits accurate replacement of

the slope stake when it is knocked out by construction activity.

Note

: When using Road Design or Section Files in Slope Staking, setting the first offset point is the recommended

procedure, as it produces the full report, referenced to cross section and template IDs, for all break points all the

way into the centerline point.

Procedure for Slope Staking with Total Stations

The procedure is nearly identical for Total Stations, except that you must press R for Read (or Enter) to take shots and

allow the program to begin calculating the Slope Stake position. Unlike the GPS, FAST Survey cannot predict the

location of the target slope stake point until at least one measurement is taken.