Operational Maintenance

0.5 hours per filter

Annual Maintenance

Initial Information Gathering

0.5 hours

Physical Checks

Torque Checks

2.0 hours

Inspection

2.0 hours

Cleaning **

2.5 hours **

Meggering

1.5 hours

Control Power Checks

Contactor Adjustments **

2.0 hours **

Voltage Level Checks

1.0 hours

Firing Check

0.5 hours

System Test **

2.0 hours **

Medium Voltage Checks

Final Inspection

0.5 hours

Phasing Check **

1.5 hours **

Autotuning**

2.0 hours **

Operation to Maximum Load

Site Dependent

Additional Tasks

Investigation **

Depends on Nature

of the Problem **

Informal Training/Refresher **

2.0 hours **

Spare Parts Analysis **

1.0 hours **

Vacuum Bottle Integrity Check **

3.0 hours **

Final Report

3.0 hours

** indicates that the time may not be required depending on the nature of the
maintenance and the condition of the drive system. These times are only
estimations.

Tool / Parts / Information Requirements

The following is a list of the tools recommended for proper maintenance of the
PowerFlex 7000 drives. Not all of the tools may be required for a specific drive
preventive procedure, but if we were to complete all of the tasks listed above the
following tools would be required.

Tools

100 MHz Oscilloscope with minimum 2 Channels and memory

5kV DC Megger

Digital Multimeter

Torque Wrench