Rockwell Automation Publication 7000L-UM301D-EN-P - June 2014
Chapter 4
Commissioning
Technical Publications
Each drive is shipped with a service binder containing all technical publications
required to commission and troubleshoot the drive line-up. This section
describes how to determine what technical publications are required and how to
obtain them in the event that the service binder is not available at the time of
commissioning or additional information is required.
PowerFlex 7000 “C” Frame
Manual
The PowerFlex 7000 “C” Frame manual will be required during drive
commissioning to guide you through each commissioning procedure. Copies of
the manual or new revisions of the manual can be requested from your local
Rockwell Automation Office.
PowerFlex 7000 Parameters
The PowerFlex 7000 Technical Data publication for Parameters is also required
for Commissioning and Troubleshooting. Refer to
latest firmware revision.
Additional Manuals
Any additional manual required to configure the drive line-up can be identified
on the Electrical Schematics. The Schematic titled “General Notes” identifies all
required Rockwell Automation Publications by publication number.
Resources Required to
Complete Drive
Commissioning
Prior to attempting to commission the drive ensure you have the following:
•
Self powered gate driver board test power cable wire harness (Part no.
80018-298-51) supplied with SCR rectifier drives only
•
Rockwell Automation electrical and mechanical diagrams
•
PLC program (if supplied with a PLC)
•
Commissioning data sheets
•
All required manuals
If any of the above information is not available prior to the time of
commissioning, please contact the factory.