313
Component Definition and Maintenance
Chapter 5
TB3-3
– Common connection of positive 15V power supply used for test power
TB4-2
– Cathode connection to SCR being controlled
TB4-1
– Gate connection to SCR being controlled
OP1
– Blue fiber optic cable receptacle – Firing pulse command from the
processor
OT1
– Grey fiber optic cable receptacle – Diagnostic status of the SCR
Testing procedure for SCR
self-powered gate driver
board
Equipment needed:
•
Digital oscilloscope
•
Function generator w/duty cycle control
•
DC power supply (+15V @ 300 mA required)
•
Digital multimeter
•
Temperature sensor board (80190-639-02)
Procedure:
1.
Connect a clamped ABB #5STP03D6500 SCR to the gate-cathode leads
of the SPGDB board (TB4-1/TB4-2).
2.
Attach a temperature sensor board to the TB2-1/TB2-2 terminals.
3.
Apply +15V test power to terminals TB3-1 and TB3-3 (TB3-1 is at +15V
while TB3-3 is the +15V return). Leave TB3-2 open.
4.
Measure TP4 to TP3, which should be +14.4V, ±100mV.
5.
Measure TP5 to TP3, which should be +5.0V, ±250mV.
6.
Measure TB2-1 to TB2-2, which should be +14.4V, ±100mV.
7.
Measure the voltage at U4-pin2 to COM, which should be +1.0V,
±100mV.
8.
Measure the voltage at U4-pin3 to COM, which should be 0V.
9.
Measure the voltage at U4-pin7 to COM, which should be +3.6V,
±100mV.
10.
Verify that the OT1 LED is off.
11.
Measure TP7 to TP3, which should be 0V.
12.
Measure TP9 to TP3, which should be +5.0V, ± 250mV.
13.
Measure TP8 to TP3, which should be 0V.
14.
Measure TP1 to TP2, which should be 0V.
15.
Connect a jumper between TB3-1 and TB3-2 and verify that the voltage
at TP6 is +2.2V, ±100mV.