Warm-up – Teledyne 6200E - Sulfides Analyzer User Manual
Page 33

Model 6200E Instruction Manual
Getting Started
M6200E Rev: A1
33
Firmware
fully booted
The revision level of the
firmware installed in your
analyzer is briefly displayed
SOFTWARE REVISION C.2
BOOT PROGRESS [XXXXXXXX 80% _ _]
The instrument is
loading the analyzer
firmware.
M200E NOX ANALYZER
BOOT PROGRESS [XXXXX 50%_ _ _ _ _]
The instrument is loading
configuration and calibration
data from the flash chip
STARTING INSTRUMENT W/FLASH : 1
System waits 3 seconds
then automatically begins
its initialization routine.
No action required.
System is checking the format
of the instrument’s flash
memory chip.
SELECT START OR REMOTE : 3
START
.
CHECKING FLASH STATUS
: 1
STARTING INSTRUMENT CODE : 1
SAMPLE SYSTEM RESET SO2=X.XXX
TEST CAL CLR SETUP
If at this point,
**FLASH FORMAT INVALID**
appears, contact T–API customer service
Press CLR to clear initial
warning messages.
(see Section 3.2.3)
The analyzer should automatically switch to SAMPLE mode after completing the boot-up
sequence and start monitoring H
2
S gas.
3.2.2. Warm-Up
The M6200E requires about 60 minutes warm-up time before reliable H
2
S measurements can be
taken. During that time, various portions of the instrument’s front panel will behave as described
in Table 3-6 below.