beautypg.com

Teledyne 6200E - Sulfides Analyzer User Manual

Page 190

background image

Instrument Maintenance

Model 6200E Instruction Manual

190

04740 Rev: A1

Table 9-1: M6200E Preventive Maintenance Schedule

ITEM ACTION

FREQUENCY

CAL

CHECK

MANUAL

SECTION

DATE PERFORMED

SO2 scrubber

Replace

As required

Yes

9.3.3

H

2

S Æ SO2

Converter Catalyst

Replace

As required

Yes

9.3.5

1

Particulate filter

Change

particle filter

Weekly

No 9.3.1

Verify test

functions

Review and

evaluate

Weekly No

Appendix

C

Zero/span check

Evaluate

offset and

slope

Weekly

--

7.3, 7.6,

7.9

1

Zero/span

calibration

Zero and

span

calibration

Every 3 months

--

7.2, 7.4,

7.5, 7.7,

7,8

1

External zero air

scrubber

(optional)

Exchange

chemical

Every 3 months

No 9.3.4

1

Perform flow

check

Check Flow

Every 6 Months

No

11.5.2

1

Sample chamber

optics

Clean

windows and

filters

Annually or as

necessary

Yes 9.3.6

1

Critical flow

orifice & sintered

filters

Replace Annually

Yes 9.3.7

Internal IZS

Permeation Tube

Replace

Annually

YES

9.3.2

Perform

pneumatic leak

check

Verify Leak

Tight

Annually or after

repairs involving

pneumatics

Yes 11.5.1

2

Pump diaphragm

Replace

At least Every 2 years

or if PRES is ≥ 33.00

in-Hg-A

Yes

See

instruction

in diaphram

kit

PMT sensor

hardware

calibration

Low-level

hardware

calibration

On PMT/ preamp

changes if

0.7 < SLOPE or

SLOPE >1.3

Yes 11.6.3

1

These Items are required to maintain full warranty, all other items are strongly recommended.

2

A pump rebuild kit is available from Teledyne Analytical Instruments Customer Service including all instructions and required parts (see Appendix B for part