beautypg.com

Preinstallation steps for the analysis nms package – Paradyne 6800 User Manual

Page 33

background image

COMSPHERE 6800 Series Network Management System

2-10

January 1997

6800-A2-GN22-30

Preinstallation Steps for the ANALYSIS NMS Package

To configure the IPC-900, refer to Figure 2-5 and follow the instructions below.

1. Set the DIP switch labeled SW1 to the I/O address 2B0.

2. Set the DIP switch labeled SW2 to the memory address D2000.

3. Set the IRQ jumper to IRQ 5.

4. Follow the instructions under Optional Host Upgrade Procedures to install the IPC-900

card in Slot 2.

5. When you have installed all cards in the processor, you must run the EISA Configuration

Utility (ECU) to configure the System 5000’s resources to match all circuit cards in the
system. For instructions on how to run the ECU, refer to the section, EISA Configuration
Utility.

6. You must load the ANALYSIS Gateway software as described in Chapter 5, Loading and

Restoring Software.

14

7

SW2

SW1

Input/Output

Starting Address

Switch (SW1)

Controller Memory

Starting Address

Switch (SW2)

Interrupt Request (IRQ)

Level Jumper

Set to 5

1 2

3 4 5 6 7

8

1 2

3 4 5 6 7

8

491-11591a-01

Push Switch

to the Indicated

Position:

5

IRQ

ON

OFF

ON

OFF

2B0

D2000

Figure 2-5. IPC-900 — Switch and Jumper Locations